The route started as a 77 km loop and finished at 93.1 km with 1,556 metres of climbing. The extra distance came from fixing it, which is how most good routes get longer.
The first job was to find out how much of it was gravel. A line on a map does not tell you the surface, so I matched the route against OpenStreetMap, which records surface type for most roads here. The answer: about 54 km unpaved, 31 km paved, and a couple of kilometres the data could not classify. That is 58 percent gravel, a respectable figure for a loop this long in a county that keeps paving.
The second job was to find the parts nobody should ride. Two stood out. The route spent about 2.7 km on US-15, a trunk road signed between 35 and 55 mph, and another 1.6 km on US-50 through Aldie. A map shows those as short connectors. On a bike they are the only minutes of the day when you are sharing a lane with traffic at highway speed. They are the first things to route around, even at the cost of extra distance.
The third job was smaller and more annoying. The loop did not close. The start and finish sat 466 metres apart on the same road, the kind of gap that appears when a route is drawn in two sittings. I closed it and checked the new line against the mapped centreline, which it follows to within a metre.
Last, I moved the start. The saved version began in Aldie because that is where it was first drawn. A loop has no natural beginning, so I rotated it to start and finish in Unison without changing the course. It is the same road. But a route that starts at the village store reads differently from one that starts in a car park eleven miles away, and it puts the hardest climbing in the middle of the ride instead of at the end.
What I take from the exercise is that a route is a document, and it deserves the same checking as one. Where is it unpaved? Where is it unsafe? Does it close? The tools for answering exist and are free. Most shared routes have never been asked the questions.
This one will go into the Cycling Unbound library once the two highway sections are replaced. Until then it stays a draft, which is what a route with 4 km of trunk road on it should be.